[prev][index][next]

The proposed increase in allocation represents a 26% increase in allocation to meet a projected population increase of approximately 74% over the permit duration.

CUP
Packet: Another increase in groundwater withdrawals during a Phase III Extreme Water Shortage --SJRWMD
14 July 2026
 
The proposed increase in allocation represents a 26% increase in allocation to meet a projected population increase of approximately 74% over the permit duration.
smaller PDF