The proposed increase in allocation represents a 26% increase in allocation to meet a projected population increase of approximately 74% over the permit duration.CUP | | Packet: Another increase in groundwater withdrawals during a Phase III Extreme Water Shortage --SJRWMD | | 14 July 2026 | |
|