22. On or before July 14, 2031, the permittee must identify project(s) that eliminate or offset its impacts to the LSFIR MFLs associated with its 6.17 mgd increase from a Demonstrated 2025 Demand of 15.41 mgd to 21.58 mgd. Implementation of the offset(s) must be as soon as practicable based on the time required for design, receipt of necessary authorizations, and construction of the project, but in no case later than July 1, 2046. Elimination or offset of potential impacts to the LSFIR MFLs for allocations above the Demonstrated 2025 Demand shall meet the requirements of Section 8 of “Offset Requirements: Implementation Strategy for LSFIR MFLs” incorporated by reference in Rule 62-42.300(7), F.A.C.

CUP
Packet: Another increase in groundwater withdrawals during a Phase III Extreme Water Shortage --SJRWMD
14 July 2026
 
22. On or before July 14, 2031, the permittee must identify project(s) that eliminate or offset its impacts to the LSFIR MFLs associated with its 6.17 mgd increase from a Demonstrated 2025 Demand of 15.41 mgd to 21.58 mgd. Implementation of the offset(s) must be as soon as practicable based on the time required for design, receipt of necessary authorizations, and construction of the project, but in no case later than July 1, 2046. Elimination or offset of potential impacts to the LSFIR MFLs for allocations above the Demonstrated 2025 Demand shall meet the requirements of Section 8 of “Offset Requirements: Implementation Strategy for LSFIR MFLs” incorporated by reference in Rule 62-42.300(7), F.A.C.
smaller PDF