[prev][index][next]

44. To address the Permittee's impacts to Lakes Brooklyn and Geneva MFLs associated with Permittee’s proposed increase in allocation above 23.6 MGD, the Permittee completed simulations and calculations utilizing the North Florida Southeast Georgia Regional Groundwater Flow Model version 1.1 (NFSEG) in combination with the KHTM local scale model version 2.1 for projected groundwater demands of 27.11 MGD. The files associated with these model simulations were received by the District on February 25, 2026, and have been filed with District Item no. 1552111.

CUP
Packet: Another increase in groundwater withdrawals during a Phase III Extreme Water Shortage --SJRWMD
14 July 2026
 
44. To address the Permittee's impacts to Lakes Brooklyn and Geneva MFLs associated with Permittee’s proposed increase in allocation above 23.6 MGD, the Permittee completed simulations and calculations utilizing the North Florida Southeast Georgia Regional Groundwater Flow Model version 1.1 (NFSEG) in combination with the KHTM local scale model version 2.1 for projected groundwater demands of 27.11 MGD. The files associated with these model simulations were received by the District on February 25, 2026, and have been filed with District Item no. 1552111.
bigger PDF