[prev][index][next]

SJCUD is required to identify offset project(s) within 5 years of permit issuance for the increase in impacts associated with the increase in allocation from its 2025 demonstrated demand of 15.41 mgd to its current permitted allocation of 21.58 mgd. Implementation of the offset(s) must be as soon as practicable based on the time required for design, receipt of necessary authorizations, and construction of the project(s), and in no case later than July 1, 2046.

CUP
Packet: Another increase in groundwater withdrawals during a Phase III Extreme Water Shortage --SJRWMD
14 July 2026
 
SJCUD is required to identify offset project(s) within 5 years of permit issuance for the increase in impacts associated with the increase in allocation from its 2025 demonstrated demand of 15.41 mgd to its current permitted allocation of 21.58 mgd. Implementation of the offset(s) must be as soon as practicable based on the time required for design, receipt of necessary authorizations, and construction of the project(s), and in no case later than July 1, 2046.
bigger PDF