Reissuance with substantial modifications from previous permit; Requires EPA review (Major POTW/non-POTW and/or POTW with an approved industrial pre-treatment program and/or Facility for which the permit includes pollutant trading)RI | | Draft reissuance Tifton wastewater permit --GA-EPD | | 30 August 2018 | |
|