WWALS Watershed Coalition, Inc. (WWALS) is Suwannee RIVERKEEPER® WWALS advocates for conservation and stewardship of the surface waters and groundwater of the Suwannee River Basin and Estuary, in south Georgia and north Florida, among them the Withlacoochee, Willacoochee, Alapaha, Little, Santa Fe, and Suwannee River watersheds, through education, awareness, environmental monitoring, and citizen activities.

WWALS
Home

Reissue: Quitman GA-EPD wastewater permit 2025-12-15 [Up]

Quitman WPCP

 -jsq, John S. Quarterman, Suwannee RIVERKEEPER®

You can help with clean, swimmable, fishable, drinkable, water in the 10,000-square-mile Suwannee River Basin in Florida and Georgia by becoming a WWALS member today!
https://wwals.net/donations/

MMM

[Reissuance, Quitman WPCP, GAJ020022 --GA-EPD 2025-12-15, Lacks Watershed Protection Plan, Must supply one]
Reissuance, Quitman WPCP, GAJ020022 --GA-EPD 2025-12-15, Lacks Watershed Protection Plan, Must supply one

[Reissuance, Quitman WPCP, GAJ020022 --GA-EPD 2025-12-15, Lacks Watershed Protection Plan, Must supply one]
Reissuance, Quitman WPCP, GAJ020022 --GA-EPD 2025-12-15, Lacks Watershed Protection Plan, Must supply one

[Reissuance, Quitman WPCP, GAJ020022 --GA-EPD 2025-12-15, Lacks Watershed Protection Plan, Must supply one]
Reissuance, Quitman WPCP, GAJ020022 --GA-EPD 2025-12-15, Lacks Watershed Protection Plan, Must supply one

[Reissuance, Quitman WPCP, GAJ020022 --GA-EPD 2025-12-15, Lacks Watershed Protection Plan, Must supply one]
Reissuance, Quitman WPCP, GAJ020022 --GA-EPD 2025-12-15, Lacks Watershed Protection Plan, Must supply one

[Reissuance, Quitman WPCP, GAJ020022 --GA-EPD 2025-12-15, Lacks Watershed Protection Plan, Must supply one]
Reissuance, Quitman WPCP, GAJ020022 --GA-EPD 2025-12-15, Lacks Watershed Protection Plan, Must supply one

[Reissuance, Quitman WPCP, GAJ020022 --GA-EPD 2025-12-15, Lacks Watershed Protection Plan, Must supply one]
Reissuance, Quitman WPCP, GAJ020022 --GA-EPD 2025-12-15, Lacks Watershed Protection Plan, Must supply one

[Reissuance, Quitman WPCP, GAJ020022 --GA-EPD 2025-12-15, Lacks Watershed Protection Plan, Must supply one]
Reissuance, Quitman WPCP, GAJ020022 --GA-EPD 2025-12-15, Lacks Watershed Protection Plan, Must supply one

LASPermit

[Summary Page, Quitman Water Pollution Control Plant GAJ020022]
Summary Page, Quitman Water Pollution Control Plant GAJ020022
PDF

[Receipt of application]
Receipt of application
PDF

FS

[Fact Sheet GAJ020022--Quitman-WPCP--Draft-Permit-Package--2025.pdf-0003]
Fact Sheet GAJ020022--Quitman-WPCP--Draft-Permit-Package--2025.pdf-0003
PDF

[5.1. Permitted design flow: 1.3 MGD]
5.1. Permitted design flow: 1.3 MGD
PDF

[7.2. Groundwater Monitoring Requirements:]
7.2. Groundwater Monitoring Requirements:
PDF

[7.4. Surface Water Monitoring Requirements:]
7.4. Surface Water Monitoring Requirements:
PDF

[8.2. Watershed Protection Plan (WPP): The permittee did not conduct a Watershed Assessment (WA) nor prepare a Watershed Protection Plan (WPP) as required by the current permit. The City will be required to complete a WA and WPP in accordance with the Notice of Violation transmitted to the City on November 6, 2025.]
8.2. Watershed Protection Plan (WPP): The permittee did not conduct a Watershed Assessment (WA) nor prepare a Watershed Protection Plan (WPP) as required by the current permit. The City will be required to complete a WA and WPP in accordance with the Notice of Violation transmitted to the City on November 6, 2025.
PDF

[10.3 Public Hearing Any applicant, affected state or interstate agency, the Regional Administrator of the U.S. Environmental Protection Agency (EPA) or any other interested agency, person or group of persons may request a public hearing with respect to an LAS permit application if such request is filed within thirty (30) days following the date of the public notice for such application.]
10.3 Public Hearing Any applicant, affected state or interstate agency, the Regional Administrator of the U.S. Environmental Protection Agency (EPA) or any other interested agency, person or group of persons may request a public hearing with respect to an LAS permit application if such request is filed within thirty (30) days following the date of the public notice for such application.
PDF

[10.5 Contested Hearings]
10.5 Contested Hearings
PDF

AppA

[Appendix A: Location Map]
Appendix A: Location Map
PDF

[Map: Quitman WPCP, GAJ020022, 2024-12-01 --Anyssa Fernandez]
Map: Quitman WPCP, GAJ020022, 2024-12-01 --Anyssa Fernandez
PDF

LASP

[LAS Permit GAJ020022]
LAS Permit GAJ020022
PDF

[Table of Contents GAJ020022]
Table of Contents GAJ020022
PDF

[Part I]
Part I
PDF

[Page 15]
Page 15
PDF

[Page 16]
Page 16
PDF

[Page 17]
Page 17
PDF

[2.b. SAMPLING PERIOD 1. Unless otherwise specified in this permit, quarterly samples shall be taken during the periods January-March, April-June, July-September, and October-December.]
2.b. SAMPLING PERIOD 1. Unless otherwise specified in this permit, quarterly samples shall be taken during the periods January-March, April-June, July-September, and October-December.
PDF

[2.e. FLOW MONITORING 2.f. RECORDING OF RESULTS]
2.e. FLOW MONITORING 2.f. RECORDING OF RESULTS
PDF

[2.g. RECORDS RETENTION 3. REPORTING]
2.g. RECORDS RETENTION 3. REPORTING
PDF

[4. SEWAGE SLUDGE AND SLUDGE DISPOSAL AND MONITORING]
4. SEWAGE SLUDGE AND SLUDGE DISPOSAL AND MONITORING
PDF

[B.1. TREATMENT REQUIREMENTS, LIMITATIONS AND MONITORING]
B.1. TREATMENT REQUIREMENTS, LIMITATIONS AND MONITORING
PDF

[B.2. STORAGE POND LIMITATIONS AND MONITORING REQUIREMENTS]
B.2. STORAGE POND LIMITATIONS AND MONITORING REQUIREMENTS
PDF

[B.3. GROUNDWATER MONITORING REQUIREMENTS]
B.3. GROUNDWATER MONITORING REQUIREMENTS
PDF

[B.4. SOIL MONITORING REQUIREMENTS]
B.4. SOIL MONITORING REQUIREMENTS
PDF

[B.5. SURFACE WATER MONITORING]
B.5. SURFACE WATER MONITORING
PDF

[C. ADDITIONAL REQUIREMENTS]
C. ADDITIONAL REQUIREMENTS
PDF

P2

[Part II A. MANAGEMENT REQUIREMENTS]
Part II A. MANAGEMENT REQUIREMENTS
PDF

[7. POWER FAILURES If the primary source of power to this facility is reduced or lost, the permittee shall use an alternative source of power to reduce or control all discharges to maintain permit compliance.]
7. POWER FAILURES If the primary source of power to this facility is reduced or lost, the permittee shall use an alternative source of power to reduce or control all discharges to maintain permit compliance.
PDF

[11. NO POINT SOURCE DISCHARGE(S) OF A POLLUTANT TO SURFACE WATERS OF THE STATE]
11. NO POINT SOURCE DISCHARGE(S) OF A POLLUTANT TO SURFACE WATERS OF THE STATE
PDF

[12.c. The following specific requirements shall apply to POTW’s. If a spill or major spill occurs, the owner of a POTW shall immediately:]
12.c. The following specific requirements shall apply to POTW’s. If a spill or major spill occurs, the owner of a POTW shall immediately:
PDF

[12.h. The owner of a POTW shall immediately establish a monitoring program of the receiving waters affected by a major spill or by consistently exceeding an effluent limit, with such monitoring being at the expense of the POTW for at least one year.]
12.h. The owner of a POTW shall immediately establish a monitoring program of the receiving waters affected by a major spill or by consistently exceeding an effluent limit, with such monitoring being at the expense of the POTW for at least one year.
PDF

[B. RESPONSIBILITIES]
B. RESPONSIBILITIES
PDF

[B.6. PENALTIES]
B.6. PENALTIES
PDF

[B.7. CIVIL AND CRIMINAL LIABILITIES Nothing in this permit shall be construed to relieve the permittee from civil or criminal penalties for noncompliance.]
B.7. CIVIL AND CRIMINAL LIABILITIES Nothing in this permit shall be construed to relieve the permittee from civil or criminal penalties for noncompliance.
PDF

[C.2.b. Watershed Protection Plan The permittee must develop a Watershed Protection Plan that reflects the findings of the Watershed Assessment.]
C.2.b. Watershed Protection Plan The permittee must develop a Watershed Protection Plan that reflects the findings of the Watershed Assessment.
PDF

[C.2.d. Once the Watershed Protection Plan is approved, each June 30th the permittee is to submit the following to EPD:]
C.2.d. Once the Watershed Protection Plan is approved, each June 30th the permittee is to submit the following to EPD:
PDF

P3

[Part III. INDUSTRIAL PRETREATMENT PROGRAM FOR PUBLICLY OWNED TREATMENT WORKS (POTW)]
Part III. INDUSTRIAL PRETREATMENT PROGRAM FOR PUBLICLY OWNED TREATMENT WORKS (POTW)
PDF